 |
 |
 |
 |
We are proud to announce that Purple Matrix is now a Carbon Neutral company, click on the climate care logo to find out more… |
|
PurpleMatrix
> IT services
> online backup
|
 |
 |
There is no excuse not to do online backup at those pricesWe are currently promoting this service and have frozen the price to £3.00 per gigabyte for backups up to 100GB and £2.00 per gigabyte for backups over 100GB. Unlike our competitors we do not impose any setup fees, license fees or any additional (hidden) fees Our Online servers are kept in the data centre secured by: - Full electronic access control system, based on Proximity cards, PIN keypads and Biometric Palm-scanners for Collocate rooms
- 24x7 local monitoring and logging of environment alarms and conditions
- Critical alarm repeating to London RMC
- Full perimeter under-floor leak detection linked to building monitoring system
- CCTV monitoring and recording of all access points and circulation areas electronic access control system, based on Proximity cards, PIN keypads and Biometric Palm-scanners for Collocate rooms
Power - Dual redundant 20MVA, 33kV dedicated underground mains feeds, 4x 11kV supplies from separate rings
- 3 (5 ultimate) x 3.8MVA 11kV diesel driven emergency power generators. Automatic start in less then 1 minute to feed 100% of the facility
- Fuel storage for 24 hour continuous operation at 100% load
UPS- 3 separate systems of 5 x 625kVA Hybrid Rotary UPS modules providing 2500kVA output each with N+1 redundancy
- Total facility UPS capacity 7500kVA N+1
- 15 Minute battery autonomy per UPS module.
- Dual redundant A & B distribution possible
DC- 4 x 6000Amps -48VDC power system for Telecom network Equipment.
- 4 Hour battery autonomy
General Facilities- Dedicated loading area
- Storage area (125 sq.m)
- 2 goods lifts (maximum loads - 3,950kg & 4,400kg)
Environment- Cooling Criteria: 750W/m², 21°C+/- 2°C, 50%RH +/- 10%
- Under floor cooling air distribution
- N+1 Perimeter down flow chiller water cooling units
- 13x1100kWr Air cooled package chillers giving 12,100kWr with N+2 redundancy
Physical- Minimum floor to ceiling clearance: 2,570mm from top of raised floor
- 350mm-550mm raised floor height depending on floor
- Raised Floor Loading 14kN/m²
- Structural Floor Slab 5kN/m²
Fire Strategy - Very Intelligent Early Warning (V.I.E.W.) detection - above and below raised floor
- Smoke extract system at 12 air changes per hour
- Double Interlocked pre-action dry pipe sprinkler system
Telecoms Infrastructure- Facility is designed to accommodate standard rack/cabinets of 2,200mm nominal height
- Power distributed under floor, fibre and copper cabling distributed overhead (fibre within a managed containment system, copper within a heavy duty racking system)
- The building has two fibre access points
| |
 |
|
 |
|
|
 |
|